1.在使用透水沥青高粘剂的时候,要注意被粘物一定要提前彻底清洗干净,并且被粘物的表面不能有水份残留,否则会影响透水沥青高粘剂的使用效果。除此之外,为了达到最好的粘接强度,要将被粘物的表面打磨光滑之后才能进行粘接。
1., when using permeable asphalt high viscosity, we must pay attention to that the sticky material must be thoroughly cleaned in advance, and the surface of the sticky material can not have residual moisture, otherwise it will affect the effect of permeable asphalt high viscosity. In addition, in order to achieve the best bonding strength, the surface of the adhesive must be grinded and smooth to be bonded.
2.由于质量好的透水沥青高粘剂具有凝固速度较快的特点,所以在使用透水沥青高粘剂的时候一定要注意现配先用,而且根据真实的用量需求来进行配置,并且配置好的沥青高粘剂不能留置过长的时间,如果配置的混合料属于快速固化的,那么每次配置的用量要更少,并且要在一两分钟之内使用,以免配置好的透水沥青高粘剂发生固化反应而造成材料的浪费。
2. because of good quality high permeable asphalt adhesive has the characteristics of high solidification rate, so we must pay attention to the coordination with when using high permeable asphalt adhesive, and are configured according to the real demand for the amount of time is too long, and not high viscosity asphalt retained good configuration, if the mix configuration belongs to fast curing then, each configuration of the dosage should be less, and you want to use in one or two minutes, in order to avoid the configured high permeable asphalt adhesive curing and waste materials.
3.因为低温会影响透水沥青高粘剂的固化速度,所以如果在低温环境下需要进行快速固化,并要拥有较高的粘接强度,那么可以视具体情况对其进行加热处理,但是需要注意的是,在涂胶时不能涂的太厚,因为胶层涂抹的越厚粘接效果就会越差。
3. because the temperature will affect the adhesive curing speed high permeable asphalt, so if in the low temperature environment require fast curing, bonding strength and to have a high, you can depend on the specific circumstances of the heating treatment on it, but note that in the glue can not be painted too thick, because the bonding effect will be thicker. The worse the smear layer.